Johnsonville School- Slip Remediation and Bank Strengthening

2.1 Background

A. A structural engineering report was commissioned by the school in April 2024 to investigate the current areas of retaining walls and slopes. Based on the site investigation, it was identified various retaining walls that are of
different constructions are currently on site, slopes with an incline of roughly 45 degrees and a few areas where slips are present. A new retaining wall was proposed along the length behind the school hall.

B. A structural engineering report was commissioned by the school in April 2024 to investigate the current areas of retaining walls and slopes. Based on the site investigation, it was identified various retaining walls that are of
different constructions are currently on site, slopes with an incline of roughly 45 degrees and a few areas where slips are present. A new retaining wall was proposed along the length behind the school hall.

• Project consultants are:

o Project Manager: Simon Ramage
o Lead Designer/ Structural Engineer: Pillar Projects Ltd

Department/Business Unit: Board of Trustees - Approve by BoT - ie. School Principal

Status Open
Tenderer https://www.gets.govt.nz/MEDUR
Closing 8 Oct 2025 4:00 PM NZDT
Reference 32476277
Notice Type Request for Tenders (RFT)
Regions Wellington
Customer Reference 251685
Contact Details Simon Ramage
simon@syrenese.nz
0274318806
Published 12 Sep 2025 9:00 AM NZST