Lincoln University is completing a replacement and upgrade of the mechanical services for the Ross (formerly Commerce) Lecture theatres. The existing air conditioning and ventilation units serving the lecture theatres are at the end of life and are to be replaced. And the unit which provides heat for the Foyer is supplied from the site steam system which is to be de-commissioned in the near future.
At the same time as the mechanical plant is being replaced, Lincoln University is taking the opportunity to replace the roof membrane and the existing upstands for the duct penetrations with upstands of a more suitable height.

What we need
Lincoln University requires a contractor to remove the existing mechanical plant and install and commission newly procured mechanical plant to meet the functional requirements of the Ross Lecture theatres. The mechanical contractor is the ‘main contractor’ on this project hence the mechanical contractor must allow for all work, apart from scaffolding to access the roof, including cranage, ‘builder’s work’, ensuring compliance with health and safety requirements, including those prescribed by the University, induction of staff to meet Lincoln University’s requirements, protection of the building and its surrounds, liaison with the Lincoln University, compliance with noise requirements, provision of facilities for use by the contractor’s and sub-contractor’s staff etc. (The roofing contractor will provide the scaffolding to allow access to the roof.)

Status Closed
Tenderer https://www.gets.govt.nz/LU
Closed 18 Oct 2023 12:00 PM NZDT
Reference 28134829
Notice Type Request for Proposals (RFP)
Regions Canterbury
Contact Details Rhys Evans
Published 21 Sep 2023 11:30 AM NZST