The project includes two components: Canopy and Stormwater
Canopy: The existing canopy structures across multiple blocks have been identified as non-compliant with the Ministry of Education (MoE) standards. The current clearlite sheeting is trafficable but requires mesh installed to the underside to achieve compliance. Due to the challenges with the mesh install method to these areas, it is decided to carry out a full replacement to all clearlite areas with specified roofing iron achieving a cost and time effective solution.
Stormwater: The school is experiencing significant water run off from Livingstone Ave, which has led to erosion along the footpath and adjacent bank. This has compromised the integrity of the area and poses ongoing safety and maintenance concerns. A licensed plumber has scoped a solution involving constructing a retaining wall along the affected elevation with additional upgrades to the Stormwater system including a two-layer drainage solution, new concrete swale drains and catchpits at both ends.
Department/Business Unit: Board of Trustees - Approve by BoT - ie. School Principal
| Status | Open |
|---|---|
| Tenderer | https://www.gets.govt.nz/MEDUR |
| Closing | 30 Jan 2026 5:00 PM NZDT |
| Reference | 33164119 |
| Notice Type | Request for Tenders (RFT) |
| Regions | Waikato |
| Customer Reference | 254914 |
| Contact Details | All enquiries to be made through the GETS Question & Answer function |
| Published | 5 Dec 2025 9:00 AM NZDT |
Whether you are a small business looking for more contract opportunities
or a large enterprise seeking market intelligence, TenderHub can help you to succeed.