Replacement of a 10m long bridge and upgrading of approximately 135m of timber boardwalk that passes through a tidal mangrove wetland on the Paihia to Opua Walkway, Bay of Islands.
The Contract Works include the following elements:
• Setting out and general site clearance, including trimming of vegetation.
• Site safety, path closure signage, and protective measurements.
• Erosion and sediment controls.
• Removal and disposal of approximately 135m of existing timber 1.2m wide boardwalk decking, joists and bearers, and the remaining bridge piles and approaches.
• Driving of four new timber bridge piles and installation of additional boardwalk timber piles where necessary.
• Supply and installation of new timber boardwalk bearers, joists and decking for 135m of boardwalk supported on existing piles.
• Supply and installation of a 10m long x 1.2m wide glulam timber bridge with barriers on both sides.
• Re-instate the existing 90mm diameter pumped sewage line onto the upgraded boardwalk and bridge.
• Any necessary temporary works.
• All other works indicated, described, or implied in the drawings or specifications.
Status | Closed |
---|---|
Tenderer | https://www.gets.govt.nz/fndc |
Closed | 10 Jun 2022 5:00 PM NZST |
Reference | 25821799 |
Notice Type | Request for Proposals (RFP) |
Regions | Northland |
Contact Details | Raelene Rankin +6494015410 |
Published | 20 May 2022 9:00 AM NZST |