The University of Canterbury (UC) Primary Data Centre (PDC) has an Uninterruptable Power Supply (UPS) that is at the end of life and needs to be replaced.
• 2N configuration with 50kW current load and at least 25% immediate growth with preference for 100 to 200% growth available but not installed. Each UPS/battery chain to support entire load so perhaps 150KVa
• Minimum runtime at 50kW of 15 minutes on single UPS (30+ on dual). Would also be good to have a 45-minute single UPS option
• Both UPS and battery replacement.
• E-waste Disposal of 4 x 200kva old units (UC will dispose of the current batteries)
• Installation and commissioning
All of the infrastructure is present for housing, monitoring and connecting and bypassing the battery banks. So basically, just swapping out UPS and batteries and commissioning.
• Please provide whole of life costs including detail of the recommended servicing cost, frequency, and duration of servicing.
Department/Business Unit: People, Culture & Campus
Status | Open |
---|---|
Tenderer | https://www.gets.govt.nz/UC |
Closing | 1 Nov 2024 2:00 PM NZDT |
Reference | 30329774 |
Notice Type | Request for Quotations (RFQ) |
Regions | Canterbury |
Customer Reference | 24-531 |
Contact Details | Phil Shaw procurement@canterbury.ac.nz |
Published | 4 Oct 2024 2:00 PM NZDT |